Name
Typehighway:construction
Last Updated2017-02-26 22:24
Admin Level15
RankStreet / Major Landmark
Importance0.1 (estimated)
CoveragePoint
Centre Point51.3828444,7.4005533
OSMway 150553951
Extra Tags
no @ (2015 Jun 08-2016 Dec 31 00:00-24:00) (access:conditional)
wegen Neubau der darüber führenden Straßenbrücke bleibt die Pontonbrücke gesperrt. (description)
designated (foot)
good (smoothness)
asphalt (surface)
yes (wheelchair)

Address

Local name Type OSM Admin level Distance
No Name highway:construction way 150553951 15 0 details >
Alt-Wetter place:suburb relation 6871864 10 0 details >
Wetter (Ruhr) place:town relation 162832 8 0 details >
Am Schlüter place:hamlet node 3166226652 15 0 details >
Ennepe-Ruhr-Kreis place:county relation 1829066 6 0 details >
Regierungsbezirk Arnsberg boundary:administrative relation 73340 5 0 details >
Nordrhein-Westfalen place:state relation 62761 4 0 details >
58300 place:postcode relation 3382203 15 0 details >
Deutschland place:country relation 51477 2 ~3 m details >
de place:country_code 0